Perancangan SOP dan Tata Letak Lantai Produksi Pada LCC Respira V.01 PAPR (Powered Air Purifying Respirator)
DOI:
https://doi.org/10.36722/sst.v6i1.655Abstract
The production process of a tool is very important in a manufacturing company, especially in producing medical equipment. The use of medical masks by health workers in handling COVID-19 patients for hours will make medical personnel uncomfortable when wearing them, one of which is congestion. Therefore, the LCC RESPIRA V.01 PAPR (Powered Air Purifying Respirator) was produced, designed by Mr. Ahmad Juang Pratama, who is a lecturer at Al Azhar University Indonesia. In the production of LCC RESPIRA V.01, a standardization of the production process is needed, so that the reliability of the product can be guaranteed. For this reason, the design of the SOP (Standard Operational Procedure) and the layout of the production floor are carried out in the production process of the LCC RESPIRA V.01 tool. The results of this study include the design of a production SOP in which several departments take part in it, namely team leader, head of the production, production operator, research and development department, head of the warehouse, and quality control department. Besides, a production floor layout design is obtained, where the total production floor area is 8.2 x 6.0 m2 with manual and trolley material handling types.
Keywords – Covid-19, Layout production floor, Medical equipment, Standard operational procedure
References
L. C. Cornelis, “Makalah Mikrobiologi Virus,†Universitas Tadulako, Palu, 2018.
World Health Organization, Development of Medical Device Policies, Jenewa: WHO Press, 2011.
A. Tathagati, “Step by Step Membuat SOP,†Efata Publishing, Yogyakarta, 2014.
J. Susetyo, R. A. Simanjuntak dan J. M. Ramos, “Perancangan Ulang Tata Letak Fasilitas Produksi dengan Pendekatan Group Technology dan Algoritma Blocplan untuk Meminimasi Ongkos Material Handling,†Jurnal Teknologi, vol. 3, no. 1, pp. 75-84, 2010.
Widayanto, “Analisis Proses Bisnis Usaha Mikro Kecil Menengah (UMKM) Konveksi Ryan Collection di Kabupaten Kudus,†Jurnal Administrasi Bisnis, vol. 6, no. 1, pp. 24-30, 2017.
A. T. Soemohadiwidjojo, Mudah Menyusun SOP (Standard Operating Procedure), Jakarta: Penebar Plus, 2014.
S. Wignjosoebroto, Tata Letak Pabrik Dan Pemindahan Bahan, Surabaya: Guna Widya, 2009.
S. M. Maryana, “Perbaikan Metode Kerja Pada Bagian Produksi Dengan Menggunakan Man And Machine Chart,†Jurnal Teknik dan Inovasi, vol. 2, no. 2, 2015.
A. S. C. Achmad Fadli Islaha, “Upaya Peningkatan Produktivitas dengan Meminimasi Waste Menggunakan From to Chart (FTC),†Prozima, vol. 1, no. 2, pp. 107-115, 2017.
C. Apriliana, A. P. Widodo dan H. B. Setyawan, “Rancang Bangun Sistem Infomasi Perencanaan Kebutuhan Bahan Baku Pada UMKM Sepatu Dan Sandal Suroso,†JSIKA, vol. 5, no. 7, 2016.
D. D. Oktarianingrum dan R. Purwaningsih, “Perancangan Metode Kerja Dan Penentuan Jumlah Kebutuhan Mesin Pada Produksi Final Assy Box Speakertype Pas 68(B),†Industrial Engineering Online Journal, vol. 7, no. 4, 2019.
J. A. Tompkins dan J. A. White, Facilities Planning, New York: John Willey & Sons, 1996.
N. Nurhasanah dan B. P. Simawang, “Perbaikan Rancangan Tata Letak Lantai Produksi di CV. XYZ,†Jurnal UAI Seri Sains dan Teknologi, vol. 2, no. 2, 2013.
Anwar, Bakhtiar dan R. Nanda, “Usulan Perbaikan Tata Letak Pabrik Dengan Menggunakan Systematiclayout Planning (SLP) di CV. Arasco Bireuen,†Malikussaleh Industrial Engineering Journal, vol. 4, no. 2, pp. 4-10, 2015.
F. Qoriyana, F. H. Mustofa dan S. Susanty, “Rancangan Tata Letak Fasilitas Bagian Produksi Pada CV. Visa Insan Madani,†Jurnal Online Institut Teknologi Nasional, vol. 1, no. 3, 2014.
J. Fakhrana, “Perancangan SOP Pembelian dan Penyimpanan Material serta Tata Letak Gudang untuk Produksi Alat Kesehatan LCC RESPIRA V.01 PAPR,†Universitas Al Azhar, Jakarta, 2021.